You want to completely renovate your house or apartment and this project represents a milestone in your life.

This article outlines the main items to include in your budget and helps you gauge the true scope of a renovation. Each element will then need to be refined and developed based on your specific choices of materials, finishes, and level of personalization.

The investment for a complete renovation in Geneva is generally between CHF 1,500 and 3,500+ per m² .

This range depends directly on:

  • the level of finish

  • the degree of personalization and finish

  • technical modifications

  • structural constraints

  • the quality of the coordination

A serious renovation is not summarized by choosing materials. It includes demolition, technical management, protection, compliance, planning and the integration of all trades.

Collet Homes pilots Full Scale Renovations.

It requires constant and structured supervision, as hundreds of technical decisions, adjustments and validations must be anticipated in advance and then controlled in the field.

Here’s what really influences the budget.

Table of Contents


Bathroom renovation prices in Geneva

A bathroom can cost 25,000 CHF.
It can also reach 90,000 CHF.
Both versions are consistent, but the difference lies in the choices made.

Standard bathroom

CHF 25,000 – 40,000

40

  • Porcelain stoneware tiles (standard sizes)

  • Prefabricated vanity unit

  • Quartz or ceramic countertop

  • Chrome-plated taps

  • Classic wall-hung toilet with concealed cistern

  • Simple lighting

The plumbing remains close to the existing system.

Electrical adaptations are limited.

Little or no custom manufacturing.

High-end bathroom

CHF 45,000 – 90,000+

Bathroom tiles, walk-in shower, marble, niche, bench

  • Marble or quartzite slabs

  • Integrated basin, either assembled or carved from stone

  • Large format shower enclosures

  • Thermostatic built-in tap

  • Integrated LED lighting

  • Custom carpentry

  • Masonry niches and benches

This level implies:

  • Scope verification

  • Enhanced waterproofing

  • Millimeter coordination

  • Longer supply times

  • Breakage risk management

The cost increases because the complexity increases.

Bathroom White Marble Paonazetto Calacatta - Marble Works of La Crau: Stone, Marble, Granite, Quartz, Slate... Paving, Coverings, Kitchen and Bathrooms.


Lire le blog
BATHROOM RENOVATION: KEY STEPS AND MISTAKES TO AVOID…

Cost of a kitchen renovation in Geneva

Standard kitchen

CHF 30,000 – 50,000

kitchen standard laminate geneva smeg quartz

  • Manufacturer’s Furniture
  • Quartz worktop
  • Standard household appliances
  • Limited electrical adaptations
  • Simple backsplash

An efficient and controlled solution, simplified management, no need to adapt to the complexity.

Custom kitchen

CHF 50,000 – 100,000+

handleless kitchen integrated high end geneva

  • Fully custom-made joinery

  • Floor-to-ceiling storage

  • Natural stone top

  • Sink integrated into the worktop

  • Concealed LED lighting

  • Possible removal of load-bearing wall

  • Electrical panel adaptation

  • High-end appliances and special features

Removing a load-bearing wall involves engineers, calculations, permits, and technical monitoring.

This is where the cost of a complete renovation in Geneva can quickly escalate.

walnut kitchen custom marble high end geneva

Custom joinery & built-in furniture

Custom-designed and built-in cupboards, dressing rooms, libraries, and offices.

bathroom vanity joinery custom oak walnut marble high end calacatta violaIndicative budget:

CHF 2,500 – 5,000 / linear meter

Variables:

  • Veneer or solid wood

  • Lacquered, varnished, or oiled finish

  • Interior design and integrated lighting

  • Hardware

  • Installation complexity and adjustment

Carpentry often involves modifications:

  • Electrical crossings

  • Ceiling levels

  • Baseboard alignments

large dressing luxury custom geneva

Electricity & Lighting

Often underestimated.

A complete renovation often includes:

  • Partial or complete resumption of circuits

  • Electrical panel adaptation

  • Creation of new lines and addition of sockets

  • Recessed spotlights

  • LED profiles and specific details

Standard budget:

CHF 12,000 – 40,000+

If the ceiling or walls are opened up to integrate lighting and new elements, expect the following:

  • Channeling, partial openings
  • Installation of false ceilings and wall linings
  • wall and ceiling renovation
  • plasters and finishes
  • related finishing touches and complete repainting

Flooring & Tiles

parquet wood flooring hardwood hungarian point chevron geneva high endIndicative price ranges:

  • Engineered wood flooring: CHF 180 – 350 / m²

  • Large format tiles (120×120 or more): CHF 220 – 400 / m²

  • Natural stone: CHF 300 – 600+ / m²

To consider:

  • Acoustic underlays

  • Flatness and health of substrates

  • Presence and compatibility of underfloor heating

  • Complex cutouts

Small and large formats require more precision, increase exposure time and therefore investment.

Often overlooked positions

Tests and studies needed

  • Asbestos and lead

  • Structural studies

  • Feasibility

  • Permits and authorizations

Construction site protection

  • Elevator protection

  • Common areas

  • Protection of elements preserved during renovation
  • Dust management

Demolition

  • Selective demolition

  • Structural verification

  • Securing networks

Sorting & recycling

In Geneva, recycling is regulated:

  • Concrete

  • Metal

  • Drink

  • Plaster

  • Specific waste

Transportation and unloading represent a significant expense.

Delivery

  • Depending on the accessibility of the property, the delivery and transport of materials will require more or less time and effort… more manpower, or even specific mechanisms (cart, crane, etc.)

  • Some materials will require additional shipping charges from the manufacturer or distributor (for example, a special crate for shipping large format ceramic tiles).

Painting & Finishing

When a major renovation is carried out, and especially when ceilings or walls are opened up:

  • Plastering, smoothing, and painting of walls

  • Painting of the woodwork and doors

Insurance

Appropriate insurance policies guarantee the ability to execute, even in the event of unforeseen circumstances.

  • Civil liability insurance for damages up to 5 million CHF caused to third parties due to professional negligence.
  • Project Owner’s Liability Insurance (RCMO) protects the project owner against civil risks related to the construction site. It covers damages caused to third parties as a result of the construction and includes legal defense costs if the project owner is sued.
  • Construction Works Insurance (TC) protects the work in progress, guarantees the continuity of the construction site, and prevents financial delays. It covers unforeseen material damage: fire, water damage, theft, and accidental errors.

Example: 100 m² apartment in Geneva

Assumption :

  • 2 high-end bathrooms

  • 1 custom-designed kitchen

  • Floors replaced everywhere

  • Built-in cupboards

  • Electrical work

  • Complete painting

  • Demolition & Recycling

Realistic investment: CHF 220,000 – 380,000 and more depending on level of finish and technical complexity.

Why are budgets changing so rapidly?

In addition to the purchase, production, and installation cost of each element, each technical decision influences another:

  • Built-in faucets → increased wall thickness

  • Stone slab → structural load check

  • Custom carpentry → electrical network modifications

  • Integrated lighting → ceiling reconstruction

  • New flooring → door adjustment

A complete renovation is a coordinated system.

The more integrated the project, the more precise and planned the execution must be.

Read the blog on
ADVANCE PLANNING IN RENOVATIONS


Conclusion

The cost of a complete renovation in Geneva depends on the level of finish, the technical complexity and the quality of coordination.

The best way to control the budget remains a structured feasibility phase:

  • Technical validation

  • Material alignment

  • Sequencing

  • Budget modeling

For a clear project, a chosen investment budget, and controlled variances.

Read more:
COLLET HOMES – GENERAL CONTRACTOR WITH PROJECT MANAGEMENT
AN APPROACH TAILORED TO COMPLEX RENOVATIONS IN GENEVA AND VAUD

— Collaboration

LET'S WORK TOGETHER

Whether you are a private client or a design professional, let's talk about your project – with no obligation. An initial discussion to clarify your intentions and plan the next step in complete confidence.